Quote template for electricians
Quotes for installation and renovation: clear items from the meter cabinet to the socket, a time-and-material clause for the unplannable.
Template by trade
Thank you for your enquiry. We are pleased to offer:
| No. | Qty | Unit price € | Total € | |
|---|---|---|---|---|
| 1 | Installation of distribution board incl. RCD/MCB (piece) | ______ | ______ | ______ |
| 2 | Fitting and connecting switches and sockets (piece) | ______ | ______ | ______ |
| 3 | Cable laying NYM-J 3×1.5 flush-mounted (per meter) | ______ | ______ | ______ |
| 4 | Measurement and test report (flat rate) | ______ | ______ | ______ |
| 5 | Travel (flat rate) | ______ | ______ | ______ |
| 6 | Labor by the hour as required (hrs) | ______ | ______ | ______ |
| 7 | ||||
| 8 |
- · We are bound by this quote for 4 weeks. All prices exclusive of statutory VAT.
- · Additional work that becomes apparent during execution will be quoted in writing before execution.
Sample without guarantee — no legal or tax advice. · Last reviewed: 2026-07
Download template
As a Word file (DOCX) to fill in, plus a PDF — free in exchange for your e-mail address.
How to calculate the electrical quote
In renovations, the state of the old installation is the big unknown — a time-and-material clause for the unforeseen (with a named hourly rate) protects your margin. Flat rates per unit (socket, switch, outlet) make the quote comparable and quick to calculate; a safety check as an entry item opens doors with existing customers.
E-invoicing & public contracts
Public and commercial clients require the e-invoice (XRechnung). DasHandwerk.xhub creates it compliantly — included, no surcharge.
Typical line items for Electricians
- Installation of distribution board incl. RCD/MCB (piece)
- Fitting and connecting switches and sockets (piece)
- Cable laying NYM-J 3×1.5 flush-mounted (per meter)
- Measurement and test report (flat rate)
- Travel (flat rate)
- Labor by the hour as required (hrs)