Quote

Quote template for tilers

Quotes for tiling work: square-metre prices by format and area, the substrate as a contingency item.

Quote
Quote no. 2026-____
LOGO
Your business · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Customer · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Date
Valid until

Thank you for your enquiry. We are pleased to offer:

No.QtyUnit price €Total €
1Checking and leveling the substrate (m²)__________________
2Waterproofing in wet areas (m²)__________________
3Laying floor tiles incl. adhesive (m²)__________________
4Laying wall tiles (m²)__________________
5Grouting and silicone joints (per meter)__________________
6Travel and material transport (flat rate)__________________
7
8
Subtotal ______
plus 19% VAT ______
Total ______
Notes
  • · We are bound by this quote for 4 weeks. All prices exclusive of statutory VAT.
  • · Additional work that becomes apparent during execution will be quoted in writing before execution.

Sample without guarantee — no legal or tax advice. · Last reviewed: 2026-07

Download template

As a Word file (DOCX) to fill in, plus a PDF — free in exchange for your e-mail address.

How to calculate the tiling quote

The laying price depends on the format — you calculate large formats and mosaic differently from 30×60. Name the format assumption in the quote. The substrate is the classic cost trap: include levelling and sealing as contingency items with unit prices, and there is no discussion during execution. Also clarify who supplies the tiles — customer supply changes your warranty.

E-invoicing & public contracts

For public contracts the e-invoice is mandatory (XRechnung). DasHandwerk.xhub produces the compliant format automatically — no surcharge.

Typical line items for Tilers

  • Checking and leveling the substrate (m²)
  • Waterproofing in wet areas (m²)
  • Laying floor tiles incl. adhesive (m²)
  • Laying wall tiles (m²)
  • Grouting and silicone joints (per meter)
  • Travel and material transport (flat rate)