Work report

Work report for metalwork: template

Installation jobs, measurements and extra work documented per site.

Work report
Report no. ____
LOGO
Your business · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Customer · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Date
Time from / to

Site / project: ______________________

No.Hrs
1Fabricate steel railing, galvanized (lm)______
2Install railing incl. fixing (flat rate)______
3Fabricate and install steel staircase (flat rate)______
4Supply and install sliding gate incl. drive (pcs)______
5Travel and installation setup (flat rate)______
6Locksmith work by the hour (hrs)______
7
8
Total hours ______
Place, date · Signature client
Place, date · Signature contractor
Notes
  • · Have the customer sign on site — the report is your proof when questions come.
  • · For time-and-material work: agree hourly rates in advance and state them in the report.

Sample without guarantee — no legal or tax advice. · Last reviewed: 2026-07

Download template

As a Word file (DOCX) to fill in, plus a PDF — free in exchange for your e-mail address.

What belongs in the metalwork work report

Document measurements with values and photos — they are the basis of fabrication and your evidence in case of fitting issues. During installation: record substrate, anchors used and extra work, and have the client sign. That turns the job into an undisputed invoice.

E-invoicing & public contracts

Railings for schools, gates for municipal yards: public clients only pay against XRechnung. DasHandwerk.xhub generates it automatically from your normal invoice.

Typical line items for Metalwork & locksmithery

  • Fabricate steel railing, galvanized (lm)
  • Install railing incl. fixing (flat rate)
  • Fabricate and install steel staircase (flat rate)
  • Supply and install sliding gate incl. drive (pcs)
  • Travel and installation setup (flat rate)
  • Locksmith work by the hour (hrs)