Work report

Daily site report for construction: template

Crew, equipment, weather and output per site day — the daily report as your evidence base.

Work report
Report no. ____
LOGO
Your business · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Customer · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Date
Time from / to

Site / project: ______________________

No.Hrs
1Earthworks and excavation (m³)______
2Foundations and floor slab C25/30 (m³)______
3Masonry, sand-lime block 17.5 cm (m²)______
4Reinforced concrete ceiling incl. formwork (m²)______
5Site setup and crane (flat rate)______
6Skilled labor by the hour (hrs)______
7
8
Total hours ______
Place, date · Signature client
Place, date · Signature contractor
Notes
  • · Have the customer sign on site — the report is your proof when questions come.
  • · For time-and-material work: agree hourly rates in advance and state them in the report.

Sample without guarantee — no legal or tax advice. · Last reviewed: 2026-07

Download template

As a Word file (DOCX) to fill in, plus a PDF — free in exchange for your e-mail address.

What belongs in the daily site report

The daily site report documents per day: crew present, equipment used, weather, work performed and special events (obstructions, owner instructions). In disputes over schedule or extras it is your most important evidence — keep it gapless and have the site manager sign it.

E-invoicing & public contracts

Public construction contracts have long required e-invoicing — XRechnung to state and municipality is mandatory. DasHandwerk.xhub generates it automatically from your normal invoice.

Typical line items for Construction companies

  • Earthworks and excavation (m³)
  • Foundations and floor slab C25/30 (m³)
  • Masonry, sand-lime block 17.5 cm (m²)
  • Reinforced concrete ceiling incl. formwork (m²)
  • Site setup and crane (flat rate)
  • Skilled labor by the hour (hrs)