Work report

Work report for flooring: template

Installed areas, subfloor readings and material per job — documented against later complaints.

Work report
Report no. ____
LOGO
Your business · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Customer · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Date
Time from / to

Site / project: ______________________

No.Hrs
1Check and level subfloor (m²)______
2Supply and install vinyl design flooring (m²)______
3Sand and seal parquet (m²)______
4Supply and fit skirting boards (lm)______
5Trim door leaf (pcs)______
6Furniture moving / clearing work (hrs)______
7
8
Total hours ______
Place, date · Signature client
Place, date · Signature contractor
Notes
  • · Have the customer sign on site — the report is your proof when questions come.
  • · For time-and-material work: agree hourly rates in advance and state them in the report.

Sample without guarantee — no legal or tax advice. · Last reviewed: 2026-07

Download template

As a Word file (DOCX) to fill in, plus a PDF — free in exchange for your e-mail address.

What belongs in the flooring work report

Before installation, document the moisture measurement and the condition of the subfloor — your evidence in case of damage from residual moisture. Then: installed areas per room, material used, room climate. The client's signature turns the report into a solid acceptance.

E-invoicing & public contracts

Flooring in schools, daycare centers and administrations runs through public clients — and they require XRechnung. DasHandwerk.xhub generates it automatically.

Typical line items for Flooring

  • Check and level subfloor (m²)
  • Supply and install vinyl design flooring (m²)
  • Sand and seal parquet (m²)
  • Supply and fit skirting boards (lm)
  • Trim door leaf (pcs)
  • Furniture moving / clearing work (hrs)

More templates for Flooring