Order confirmation

Order confirmation for AC work: template

System, installation location, line routing and date — confirmed before units are ordered.

Order confirmation
Order no. 2026-____
LOGO
Your business · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Customer · Street · City
Name
Company
Street, no.
ZIP, city
E-mail
Date
Execution date

Thank you for your order. We confirm the execution of the following services per our quote no. ______ dated __.__.____:

No.QtyUnit price €Total €
1Supply and install split AC unit 3.5 kW (pcs)__________________
2Run and insulate refrigerant lines (lm)__________________
3Evacuate, pressure test and commission (flat rate)__________________
4Leak test per F-gas regulation (flat rate)__________________
5Condensate line incl. pump (flat rate)__________________
6Refrigeration service work (hrs)__________________
7
8
Subtotal ______
plus 19% VAT ______
Total ______
Place, date · Signature client
Place, date · Signature contractor
Notes
  • · Our quote no. ______ forms the basis; deviating agreements are listed above.
  • · Schedule shifts for reasons beyond our control are not at our expense.

Sample without guarantee — no legal or tax advice. · Last reviewed: 2026-07

Download template

As a Word file (DOCX) to fill in, plus a PDF — free in exchange for your e-mail address.

Why the order confirmation matters in AC work

AC units are ordered per project and installation dates agreed with the client — the order confirmation fixes unit type, locations and line routing. Also record client-side works (power supply, wall openings, scaffolding), or your fitters will stand before a closed wall.

E-invoicing & public contracts

AC for server rooms of public offices or municipal practices: public clients require XRechnung. DasHandwerk.xhub generates it automatically.

Typical line items for Refrigeration & air conditioning

  • Supply and install split AC unit 3.5 kW (pcs)
  • Run and insulate refrigerant lines (lm)
  • Evacuate, pressure test and commission (flat rate)
  • Leak test per F-gas regulation (flat rate)
  • Condensate line incl. pump (flat rate)
  • Refrigeration service work (hrs)

More templates for Refrigeration & air conditioning